All of the coal was transported from the mine to the North Queensland Export Terminal, north of Bowen, by the Bowen Rail Company, using trains running on the 200-kilometre Carmichael Rail Network that connects the Galilee Basin to the Newlands Rail System into the Port of Abbot Point.