Qube operations manager Scott Sims said while COVID-19, combined with labour and material shortages, meant the new ramp had been a long time in the making, the final design was the product of a “strong and productive collaboration” between industry professionals, including the Frontier team and Cam Mackie from Argyle Engineering in Kununurra.