ANDRITZ is supplying the electro-mechanical equipment for the pumped storage hydro elements of the project with some parts delivered into the port including; stay rings, spiral case sections, draft tube liner sections, draft tube cones and draft tube gate frames for the embedment into the concrete structure of the powerhouse.
