The report outlines how the Mt Rawdon project will require the construction of a dedicated pipeline from Paradise Dam to the mine pit, so that 15,295 ML of ‘reserved’ water from the Burnett River in the Bundaberg Water Supply Scheme and 6,300 ML in the Upper Burnett Water Supply Scheme can be accessed.